Scenario 1
The late drawing change
A racking layout changes two days before installation. The M&E contractor says the charging points are already set out.
Three quick scenarios to test how you would spot coordination risk before it becomes an expensive site problem.
Scenario 1
A racking layout changes two days before installation. The M&E contractor says the charging points are already set out.
Scenario 2
A fit-out phase blocks a main pedestrian route during peak picking hours.
Scenario 3
The client wants to occupy on Monday, but snagging, test certificates and O&M information are incomplete.